Skip to main content
Folio

Trust your estimate.Build it fast.

Folio reads your drawings, writes the scope and prices it with your own numbers. For general contractors and real estate developers.

See it work

Three things every project needs. Done in minutes.

Try it on your drawings

Drawings in. Priced budget out.

Upload the set and get hard costs by trade, each line traced to its sheet.

Drawing set.pdf

142 sheets

TradeCostSheets
Concrete$4,820,000S-201, S-301
Drywall and framing$2,140,000A-401, A-520
Doors and hardware$960,000A-601
Total hard cost$7,920,000

Illustrative figures.

The Numbers

Insights

View all
Construction blueprints and drawings on a job site

Our Approach

From drawings to scope of work, by trade.

Upload your drawing set. Folio indexes it and writes the scope of work by trade and CSI division, ready for subs to price and for the estimate to be built on.

Scope Breakdown
Engineer inspecting drawings on a capital project site

Drawing Intelligence

Ask your drawings. Get a cited answer.

Folio indexes the set by sheet, discipline and CSI division and pulls the notes into one library. Ask a question and get an answer from the documents with a citation to the page, so you can open the sheet and check it.

Drawing Intelligence

Your Data

Your scope, priced with your own numbers.

The numbers that price a building are scattered across past estimates, sub quotes and vendor emails, each in a different format. Folio prices each scope line with the unit prices you have entered, marks any web lookup it used as a fallback, and carries awarded subcontractor pricing in from Bid Leveling.

What you have

Hotel renovation cost report.pdfPast project
Bid set estimate.xlsxPast project

What comes in

Drywall sub quote.pdfSub quote
GC budget rev 3.xlsxGC
Stone vendor quote (email)Vendor
Folio

Structured by scope item

Usable on this project

Scope itemQtyLast paidQuoted nowSource
F&I 5/8" Type X gypsum board18,200 SF$5.90$6.40Sub quote
F&I hollow metal door42 EA$1,090$1,180Vendor quote
Slab on grade, 5"12,400 SF$8.20$8.75GC bid

Illustrative figures. Same work, same item, on every project and every quote.

Talk to Sales
Aerial view of a large capital construction project

The Problem

70% of GC capacity wasted on bids they won't win

Precon teams spend weeks writing scope by hand — then wait weeks more for subs to price it. By then, they've passed on other work they could have won. The bottleneck isn't capacity to build — it's capacity to bid.

Source: FMI Research

Our story

Ready to bid smarter?

Bring a drawing set. We will show you the scope, the estimate and the risk register Folio builds from it.

Currently onboarding select GC partners.

Or email us at connect@joinfolio.ai